top of page

The final walkthrough of the Madrona basement

Writer's picture: Ellen MirroEllen Mirro

Our clients are using their newly finished spaces. The furniture arrives next week, and the TV still has to be mounted, but the project turned out just as they wanted.

DLH General Contracting did a fantastic job, and kept on schedule. http://www.dlhinc.com

The speakeasy bar and back bar were existing, everything else in this room was designed to match.


The new fireplace makes the room cozy. Wires for the TV will be routed through the conduit when the TV is mounted on the wall.


The stairs and stair wall are original, the newell and railing are new.


1 view0 comments

Recent Posts

See All

Comments


bottom of page