The fluid applied vapor permeable water barrier has been applied. Siding and flashing is next. The deck and front porch columns will also be installed soon. Now that the windows are in the insulation can be installed and then its on to gypsum wall board on the interior. All rough plumbing and electrical has been installed.
The addition is ready for siding and the deck.
The skylight will bring lots of light into the kitchen.
Comments